How do I apply for New Connection?
|
To apply for a new connection you need to visit your nearest Divisional / Sub Divisional office, where you would be required to fill up the requisition form for new connection. Click here to download the application form for new connection. |
Please carry a copy of following documents such as: |
 |
Ownership sale agreement |
 |
Election ID |
 |
Ration card |
 |
Latest monthly maintenance receipt of registered society |
 |
Copy of Passport |
 |
Passport size photographs |
 |
Possession / Allotment Letter (Government Premises) |
 |
Land Lord's No Objection Certificate (in case of tenant) |
|
No objection certificate from other owners if applicant is joint owner of the property. Information required in addition to the above are:
|
| Test Report verified by Government authorized electrical contractor stating details of the connected load of electrical appliances present in your premises. |
|
| What is the cost of Application form? |
The requisition form is available free of cost. |
|
| What do I have to do after submitting my form? |
After submission of requisition form you will get acknowledgement slip mentioning details of the date of submission of new connection application form and a unique Application number. |
|
Thereafter an Electrical Engineer will visit your premises to verify the details you have submitted; of the load connected and the dues existing at your site. Based on his verification, your Application will be accepted or rejected. If the Connection is sanctioned a demand note will be raised and you will need to deposit the requiste amount at the BSES office. |
|
Within 7 days of payment of the demand note by you, your connection will be energized. |
|
| What is the procedure and condition required for obtaining 3-phase connection? |
You may directly approach our Customer Help Desk at the Divisional/Sub Divisional Office. A Three Phase Connection at a Domestic/Commercial/Industrial should have a minimum load of 11 KW. All the formalilities will remain same as that of a Single Phase Connection as specified in Question Number 1. |
|
Is it mandatory to apply through Electrical Contractor? |
| It is mandatory to apply for New Connection through the Electrical Contractor because the electrical wiring of your premises has to be in perfect condition. Since a consumer cannot verify or authenticate the status of the wiring at his/her premises, so he/she has to authenticate the same from an Electrical Contractor specified by the Government of Delhi. |
|
Formalities involved in replacement of Burnt Meter at Premises: |
| A Consumer has to approach the Divisional/ Sub Divisional Office with a copy of his/her latest paid Electricity Bill. Charges will be based on the age of the meter. |
If the meter is less than two years old: 100% cost will be borne by consumer |
Two-Five years: 75% cost to be borne by consumer |
Five-Eight years: 50 % cost to be borne by consumer |
Eight-Ten years: 25 % cost to be borne by consumer |
|
Formalities involved in replacement of Defective Meter at Premises: |
A Consumer has to approach the Divisional/ Sub Divisional Office with a copy of his/her latest paid Electricity Bill. No fee will be charged from the Consumer, once the meter is declared defective by the Field Engineer. |
| |
| Formalities involved in Testing of Meter at Premises: |
A Consumer has to approach the Divisional/ Sub Divisional Office with a copy of his/her latest paid Electricity Bill. Following will be the testing fee based on the type of the meter:
Single Phase Meter: Rs. 50/-
|
Three Phase/ CT Meter: Rs. 100/-More Ten years: Free of Cost |